Road and roadside infrastructure
Maintenance works in the road tunnel under the Martwa Wisła River
Implementation details
The tunnel under the Martwa Wisła River is Poland’s longest underwater crossing and one of the flagship investments of the City of Gdańsk. It links the western part of the city with the Port Island, allowing the drivers to bypass the crowded city center.
At the stage of its construction, ELDRO Group was responsible for the development and implementation of the electrical and ICT infrastructure, video monitoring systems, weather stations, variable message signs, and the vehicle height and weight control system.
When the tunnel was opened in April 2016, as a subcontractor of Siemens Mobility Ltd., we assumed control over tasks related to the maintenance of the devices and systems operating in the tunnel. The maintenance and service work is performed in accordance with strict SLA standards, which impose strict requirements regarding timing and technical aspects of service.
The scope of our work on the maintenance of the tunnel under the Martwa Wisła River can be illustrated with the following statistical data:
Statistical data provided by Municipal Administration of Roads and Green Areas in Gdańsk